Trying to work out whether to install an east west orientation system, a fixed axis or north-south axis single tracking system is a complex task that involves trade-offs between cost of land, cost of panels and costs of tracking systems
A PV farm gets paid for:
Problems with system strength (and inertia) can be addressed by adding:
System strength relates to the magnitude of change in X after a system fault. X = ?
In the NEM (Australia) we have a nodal pricing system, where there are different prices for power within each state to help incentivise new generation where there is transmission capacity, or new load close to existing generation infrastructure.
What does MLF stand for?
Which of these statements about grid connection capacity is correct?
Which of these is the most important factor for choosing a utility scale PV farm site?
Which of the following are important factors for siting a solar PV farm?
Raising finance for PV projects is very easy because all PV project will make easy money because solar PV panel costs are so low.