A company has won a large project to be constructed in the next seven years. A specific piece of equipment is required that will be used only on rare occasions throughout the project’s construction. Your company has enough capital to buy this equipment. As the machinery manger, select the best answer from the list of alternatives offered as to how the company should supply this equipment.
100%
0%
0%
0%
View this question
The following costs are different elements associated with construction equipment: transportation between yard and jobsite, equipment yard security, equipment loan repayment, and overtime surcharges. Select the correct answer below that properly sequences these costs according to their cost type.
0%
0%
0%
0%
View this question
Which parameter set affects the hourly fuel cost for equipment operation?
100%
0%
0%
0%
View this question
Which one of the following items is not counted in the calculation of the operator cost?
0%
100%
0%
0%
View this question
After completing the base of a road, a further construction requirement is needed for drainage canals to be constructed on both sides of the road. The depth of canals is 150 mm and width is 200 mm. Which piece of equipment would be used to construct the drainage canals?
0%
100%
0%
0%
View this question
As a machinery manager, you decide to buy a new wheel loader with the capital available in your construction company. What is the interest (investment) cost of this equipment?
0%
0%
100%
0%
View this question
You are planning to cut a 200 mm layer thickness of soil and spread it 1 km in a cut and fill operation. The soil is relatively hard. Which one of the following equipment fleet options is not a good option to do this task?
0%
0%
0%
0%
View this question
For a piece of construction equipment with an expected life of 5 years, which of the following depreciation methods yields the highest depreciation percentage in the first year?
0%
0%
0%
0%
View this question
You are planning to cut a 100 mm layer thickness of soil and spread it in another place with the distance of 800m in a cut and fill operation in the construction of an airport runway. The soil is relatively soft. Which piece of construction equipment would offer the best performance in doing this task?
100%
0%
0%
0%
View this question
Which two equipment pieces can be typically used for side casting?
0%
100%
0%
0%
View this question

Want instant access to all verified answers on moodle.telt.unsw.edu.au?

Get Unlimited Answers To Exam Questions - Install Crowdly Extension Now!

Browser

Add to Chrome