An H-pile is installed to support foundation excavation of a commercial building site as below.
(a) Draw the pressure loading diagram along the pile with each load indicated in the drawing. (2 Marks)
(b) Assuming that the embedment depth D of the pile is 3 m, is the project design safe to proceed? (8 Marks)