For new utility scale solar farms, MLFs can be greater than one. This is because
renewable energy plant are favoured by AEMO and are given an "uplift" factor
if a new generator replaces a generator that is far from load centre, there is a reduction in overall transmission losses
transmission losses between the plant and the load centre need to be taken into account
renewable energy plant only connects into the sub-transmission and distribution networks and therefore are not subject to MLF, only DLF.