The following statements about tower crane are correct, except:
Luffing cranes are used to ensure the jib stays within site boundaries
Hammerhead cranes are faster in operation
Hammerhead cranes are typically cheaper than luffing cranes
2-part line configuration is slower, but has higher capacity than 4-part line
Hammerhead cranes usually have lower capacity that luffing cranes