A bakery runs one 9-hour shift, 7 days a week, with a design capacity of 250,000 rolls. Due to varied product mix, the actual output dropped to 180,000 rolls. If the effective capacity was 210,000 rolls, calculate the Utilization and the Efficiency.
Which of the following is the correct pair (Utilization%, Efficiency%)?