QUESTION45. Vasco manufactures tubes for industry. The calculation of the full ...

✅ The verified answer to this question is available below. Our community-reviewed solutions help you understand the material better.

QUESTION45.

Vasco manufactures tubes for industry. The calculation of the full cost is

obtained by adding a direct cost item – the cost of components – and indirect

costs calculated via an ABC system, the parameters of which are presented

below.

TUB1 and

TUB2 are two products in Vasco's catalogue. The cost of components for TUB1 is

€250  per unit and that of TUB2 is

€100  per unit.

Activity

Cost driver

Unit

cost of cost driver (in €)

Number

of cost drivers per product

TUB1

TUB2

Assembly

Number of components

€ 2.5

10

6

Soldering

Soldering

time (hours)

€ 4

3 hours

1 hour

Polishing

Polishing time

(minutes)

€ 8

3 min.

0

Drying

Drying time

(hours)

€ 8

2 hours

4 hours

Ionization

Ionization time

(Hours)

€ 3

2 hours

2 hours

Quality control

Control

time (minutes)

€ 5

8 min.

5 min.

How many

indirect costs are allocated to TUB1?

0%
0%
0%
100%