Which of the following statement is correct about diaphragm wall.
The adjacent panel will be excavated immediately after the first panel has been cast, starting from the inside bite.
To build a continuous diaphragm wall the primary precast panels are firstly inserted into the ground and spaced at a distance slightly smaller than the panel width. The secondary panels are built next to the primary ones.
It is not suitable for high water table conditions.
Diaphragm wall is a temporary reinforced concrete structure constructed panel by panel.
In the construction process of a diaphragm wall, bentonite is used to stabilise the ground before concrete is poured.