Which two of the following options refer to the second technique of work study, namely work measurement?
a Process charting.
b Time study.
c The duration of a task.
d Layout planning.
1 ab
2 bc
3 ac
4 ad
Peruse the following four statements, then state which three statements below refer to the concept of work study?”
a It is a concept which determine remuneration systems.
b It is an aid of management.
c It is based on method study and work measurement.
d It is the examination of all aspects of human work.
1 abc
2 acd
3 abd
4 bcd
Refer to the description of Element 1
below. Then state which one of the following symbols apply to this
description?
Element 1: “Move books to storeroom”.
1 Inspection
2 Operation
3 Transport
4 Delay
Refer to the following information which was part of a time study investigation.
The observed time for an operation is 1.760 centi-minutes,
The rating is 80,
The frequency is 1/1 and
Rest allowance is 11%.
Calculate the Actual Time state which of the following is the correct answer? Work to three (3) decimal places.
1 1.363
2 1.463
3 1.563
4 1.663
Element
number
|
Observed
time
|
Observed
rating
|
Basic
time
|
Frequency
|
Selected
Basic Time
|
Rest
allowance
|
Actual
Time
|
1
|
1.760
|
80
|
|
1/1
|
|
11
|
|
Refer to the following information which was part of a time study investigation.
· The observed time for an operation is 0.76 centi-minutes,
·
·
Calculate the Selected Basic Time state which of the following is the correct answer? Work to two (2) decimal places.
1 0.85
2 0.96
3 1.14
4 1.28
Element
number
|
Observed
time
|
Observed
rating
|
Basic
time
|
Frequency
|
Selected
basic time
|
1
|
0.76
|
75
|
|
2/1
|
|
Process charting is used in method study to
record all the relevant steps of a process. It consists of several charts.
Which one of the following chart only uses all the symbols?
1 Flow process chart
2 Multiple activity chart
3 Outline process chart
4 Travel chart
The definition of work study consists of critical concepts which allude to why work study is carried out. Peruse the options below and then state which three of these concepts are contained in the definition of method study?
a systematic recording
b critical examination
c reduce costs
d qualified worker
1 abc
2 abd
3 acd
4 bcd
The following table shows the observation times and ratings of two elements. Calculate the Basic Times for these two elements and state which one of the following options is correct. Work to two (2) decimal places.
Element
number
|
Observed
time
|
Observed
rating
|
Basic
time
|
1
|
0.78
|
85
|
|
2
|
0.87
|
90
|
|
1 0.56 and 0.66
2 0.66 and 0.78
3 0.76 and 0.86
4 0.86 and 0.96
Which one of the following options below refers to “examining the methods of working an the workplace”
1 Time study
2 Work study
3 Method study
4 Work measurement
The technique, method study concentrates on which three
of the following?
a Stating the real facts about a particular situation.
b Determining the duration of tasks.
c Investigating these facts critically.
d Finding the best possible solution under the current circumstances.
1 abc
2 bcd
3 acd
4 abd