Units

SECTION A

SECTION B

1

Effectiveness

A) refers to

that part of the total cycle time of a

machine- (or process-) controlled task that the worker is required to carry

out at a standard performance level.

2

Profitability

B) is regarded as

the assessment of the worker's rate

of working relative to the observer's concept of the rate corresponding to

standard or normal pace.

3

Productivity

C)

is the ratio of

machine running time at standard to machine available time.

4

Labour productivity

D) is the time during which a machine cannot be

operated on production or ancillary work owing to breakdown, maintenance

requirements, or for other, similar reasons.

 

5

Productivity improvement

E) involves

work in which the output of the worker is limited only by

factors within the control of the worker.

6

Unrestricted work

F)

is usually determined by calculating the labour

outputs per worker hour or machine hour and comparing it with a previous

performance or period.

7

Machine downtime

 

G)

is achieved through simpler product designs and specifications.

8

Machine effective utilisation index (MEUI)

H) can be measurement at various

levels of various industrial functions and factors of production one of which

it is a company.

 

9

Rating

I)

the

attainment of a desired goal - in other words, the correct task has been

completed regardless of the method or technique used to achieve it

10

Load factor

J)   

is

the relationship, expressed as a percentage, between profits made during a

specific period and the capital used to make the profit

Більше питань подібних до цього

Хочете миттєвий доступ до всіх перевірених відповідей на mymodules.dtls.unisa.ac.za?

Отримайте необмежений доступ до відповідей на екзаменаційні питання - встановіть розширення Crowdly зараз!

Browser

Додати до Chrome