Having waterstops around pipe penetrations and in slab-to-slab construction joints is classified as _____________ waterproofing protection.
As a retaining wall or shoring system, contiguous piles are suitable for:
A 150-m building is located in Sydney and is oriented NE-SW. The terrain category is category 4. The building is located around a hill, 40 m from the crest. The height of the hill is 40 m and the gradient of the hill is 10%. Calculate design wind speeds for a wind coming from NW at 75 m of the building height if R is 500.
What was the main cause of Hotel New World collapse in Singapore?
A building is located in Tasmania about 475 m above the sea level. You are tasked to calculate wind actions. When the hill inclination (slope percentage) is 3%, H is 20 m, x is 20 m, and z is 40 m, determine Mt (hill-shape multiplier).
A building is located in Darwin. When the value of R is 500, determine VR in m/s.
Which of the following statement about steel sheet piling retaining wall is correct?
Choose the correct statement about the structural system of a high-rise building.
These statements below about the cut and cover technique (or bottom up technique) are correct, except:
Which one is the correct sequence of constructing a basement in top down construction?