What is one of the disadvantages of concrete piles?
Select all the correct statements about pile necking.
i. Pile necking is generally acceptable as it does not affect the structure of a building.
ii. Pile necking does not happen when steel piles are used.
iii. Pile necking may happen when the casing was retracted above the concrete being placed.
iv. Pile necking is caused by a pile being squeezed by soil because the lateral pressure from the soil is greater than the wet concrete mixture.
v. Pile necking is a disadvantage of driven piles.
Which one of these is classified as a mixed-use high-rise building?
Cracks appeared on the walls of a building. Investigation found that a burst pipe underground affected the building's foundation which then causing the cracks. This scenario can be described as _________.
The following statement is true EXCEPT:
The following are the advantages of bored piles, EXCEPT ______.
Select the correct statements.
i. The side core system permits spaces to varying depth to receive natural light from all directions.
ii. In comparison to side core, the central core system is more stable as the cores are interconnected with the main structural frame, thus resisting a substantial amount of lateral loads.
iii. In the side core system, it is more inconvenient for tenants located the farthest from the core as access to building utilities are also the farthest.
iv. In the central core system, an access corridor is required around the core's perimeter, however, access is equal and equidistant for all sides.
What is one of the criteria to define whether a building is considered a high-rise building or not?
Please select the correct process of CFA piling works.
The following are reasons on why it is more effective to locate the residential space on the upper part of a high-rise building, except: