logo

Crowdly

Browser

Add to Chrome

ICT201 Information Technology Project Management (S1, 2025)

Looking for ICT201 Information Technology Project Management (S1, 2025) test answers and solutions? Browse our comprehensive collection of verified answers for ICT201 Information Technology Project Management (S1, 2025) at moodleprod.murdoch.edu.au.

Get instant access to accurate answers and detailed explanations for your course questions. Our community-driven platform helps students succeed!

Select from the option that best answers Question 5, which is provided in the Topic 3 Workshop.

0%
100%
0%
0%
View this question

Answer Question 4 (as provided in the Topic 3 Workshop), by selecting the best option below.

0%
100%
0%
0%
View this question

There are a variety of different techniques utilised to structure and define the Workstreams, elements, and work packages in a WBS.  Five of these methods are outlined in this question.  On

the left-hand side of this question you will see a range of different methods outlined.  To the right of each

of these is a selection box.  In each of

these boxes, select the term that is used to define the approach described on

the left hand side of each option. 

Hint:  Read the sentences carefully and understand the terms and their meaning.  If you have any doubts, please review the Topic 3 lecture material.  Please also note that each of the terms for each method should only be used once.

View this question

Select True or False in relation to the statement made in Question 2 within the Topic 3 lecture.

100%
0%
View this question

Please answer Question 1, which is provided in the Topic 3 lecture, by selecting the most appropriate option from those provided below.  Note that the terms you will need to define have been replaced with the codes 'X' and 'Y'.

100%
0%
0%
0%
View this question

Using

the PERT formula provided in the Topic 4 lecture, calculate

the Weighted Average

Duration for an activity, where the

estimates are provided in the Question 5 scenario (see the Topic 4 Workshop). 

Hint: Use the formula that was provided

0%
0%
0%
100%
View this question

Identify the duration of the critical path from the Arrow Diagramming Method model, which is provided in Question 4 (outlined in the Topic 4 Workshop).  Hint:  There is only one correct answer.  Consequently, check your pathway calculations carefully before selecting your option.

0%
0%
0%
0%
0%
0%
0%
0%
View this question

From the descriptions provided on the left, match these to the options available in the boxes to the right.  Hint:  Please read the options carefully.  Additionally, please be aware that the full terms are not included and only the abbreviations are supplied.  It is important that you remember these abbreviations, as these are used when developing your Work Breakdown Structure (WBS).

View this question
From the four answers provided below, please select the MOST CORRECT option that best aligns to the query posed in Question 1 within the Topic 4 lecture.  Please remember that the terms have been replace with 'X' and 'Y'.  Therefore, ensure that you have the meanings of the 'X' and 'Y' codes before you start this question.  Hint:  Read the options carefully, as there is only one fully correct option.
0%
100%
0%
0%
View this question

Answer Question 4, which is provided in the Topic 2 Workshop, by selecting the correct listing from the following options.  Hint:  If you are unsure, make sure that you look at the Topic 2 lecture material, to refresh your memory on the steps.

0%
0%
0%
0%
View this question

Want instant access to all verified answers on moodleprod.murdoch.edu.au?

Get Unlimited Answers To Exam Questions - Install Crowdly Extension Now!

Browser

Add to Chrome