✅ The verified answer to this question is available below. Our community-reviewed solutions help you understand the material better.
A service is supplied by parallel feeders installed in three seperate metal raceways, each containing 4/0 AWG copper phase conductors. Determine the minimum size of the service bonding jumper for each raceway using a seperate copper bonding jumpers for each conduit.