For using regenerative energy the following construction is installed in a hydro...

✅ The verified answer to this question is available below. Our community-reviewed solutions help you understand the material better.

For using regenerative energy the following construction is installed in a hydropower plant: A synchronous machine is driven by a water turbine which is supplied by a reservoir that is located 10m above the turbine. To match the rated speeds of the generator and the turbine a gearbox is placed between both. Calculate the gear ratio of the gear box.