✅ The verified answer to this question is available below. Our community-reviewed solutions help you understand the material better.
You have a critical path that includes a multiplier C=A*B, where A and B can be any number. It’s the critical path, the longest path in the design by at least a factor of 2 (measured post-compile). Which is the best strategy to deal with it?