If you have a design with one (critical) path much longer than the others which are the generally accepted ways to fix this. Choose a combination of the following (or just one).

A. Tell synthesis that this path can take two clock cycles to complete.

B. Insert a pipeline register.

C. Redesign the logic so that it is more "parallel" and less "serial"

(Note, this question was also addressed in the revision notes)