logo

Crowdly

Browser

Додати до Chrome

BLDG2013-Construction Estimating (T1, 2025)

Шукаєте відповіді та рішення тестів для BLDG2013-Construction Estimating (T1, 2025)? Перегляньте нашу велику колекцію перевірених відповідей для BLDG2013-Construction Estimating (T1, 2025) в moodle.telt.unsw.edu.au.

Отримайте миттєвий доступ до точних відповідей та детальних пояснень для питань вашого курсу. Наша платформа, створена спільнотою, допомагає студентам досягати успіху!

Assuming that lowest bidder wins at the lowest bid price, your firm’s cost estimates and bids, and bids of its competitors for the last five construction contracts are as below. (Show all calculations, 22%)

 

Contract

Your firm cost estimates (mil)

Your firm bids (mil)

Competitor A bids (mil)

Competitor B bids (mil)

Competitor C bids (mil)

1

210

222

235

215

240

2

115

130

128

132

131

3

55

60

57

58

55

4

110

110

118

121

123

5

385

395

388

387

390

 

 

(a)  What is the average percentage mark-up of your firm for the five bidding attempts? (5%)

(b)  For the five bidding attempts, evaluate the bidding performance (i.e., bidding competitiveness and consistency in bidding) of your firm using the Bid Competitiveness Ratio (BCR) measure. (10%)

(c)   Make two comments on the results obtained in (b). (3%)

(d)  Calculate the market share of your firm and its competitors, comment on the results. (4%)

Переглянути це питання

Your

firm has kept a good database of its bids, cost estimates and the winning bids

for past bidding attempts. As a chief estimator who just joined the firm, you

propose the use of cost estimate competitiveness ratios (CECR) from your firm’s past bidding attempts in

assessing the competitiveness of your firm’s cost estimate. The output of this

CECR measure can be used in the formulation of your firm’s bidding strategies

for future bidding attempts. Use a hypothetical plot to present and discuss your

proposal and its application in future bidding attempts.

(10%)

Переглянути це питання

You are required to build up the net cost unit rates

for work items in a bill of quantities from first principles.

(22%)

(a) 

Explain how to build up net cost unit

rate from first principles. (2%)

(b) 

Estimate the net cost unit rates for

following work items and calculate the total net cost of these items. (NB: Show

all calculations, 20%)

 

 

 

Unit

Qty

Rate

Total

 

Items

 

 

 

 

a

Common

brickwork in 1:1:6 composition mortar in 76mm thick on edge wall

s.

 

m2

150

 

 

b

Face brickwork in 1:1:6 cement

mortar coloured by the addition of yellow oxide in 110 thick skins of cavity walls

having joints ironed on one face.

m2

275

 

 

 

 

 

 

 

 

 

 Total

 

 

 

 

 

Additional

information:

Materials

(supply only delivered to site):

Common bricks

(230 x 110 x 76) $ 1,200.00/1000

Face bricks

(230 x 110 x 76) $ 1,400.00/1000

Cement

$ 12.50/bag; Sand $ 120.00/t;

Lime $ 25.00/bag

Dry material for mortar required for 110mm thick brick

walls: allow 3 bags of cement, 3.2 bags of lime and 0.70t of sand

Dry material for mortar required for 76mm think edge

walls: allow 2.4 bags

cement, 2.6 bags lime, and 0.55t of sand

Yellow

oxide $ 40.00/kg; allow 4kg per 1000 standard bricks laid

Allow 10%

wastage on face brick and mortar, 5% wastage on common brick

 

Subcontract

labour rates:

Common

brickwork $ 2,100.00/1000

Face brickwork

$ 2,300.00/1000

Make no

allowance for attendance and supervision of subcontractor (included in

preliminaries)

 

Plant:

Cement mixer

hire $ 85.00/day

Make no

allowance for scaffolding, included in preliminaries

All further

information is to be assumed

 

Переглянути це питання

You

are required to prepare a cost plan for a new hospital clinic in

Coffs

Harbour

, NSW for a tender scheduled for June 2026

.

To complete this task, you do have access to

dimensioned sketch design drawings.

However, there is

a need to locate a comparable cost analysis of a

past similar project. (

18%)

(a) 

What

is your preferred source of cost analysis?

Why? (3%)

(b)  Assuming the

comparable cost

analysis is for a project in

Port Macquarie,

what

are the adjustments to be made to the cost analysis of the past project before

it can be used for the new project? Justify the need to make the required

adjustments. (4%)

(c)  

For

the adjustments identified in (b), calculate the adjustment factors by using

the information given above [Note: you need to make assumptions on the indices,

and you are not required to access a cost guide].  (6%)

(d) 

In

costing the ‘floor finishes’ element of the new project that is different from

the past project, which method would you select for costing this element?

Explain the selected method.

(5%)

Переглянути це питання

There

is a ‘right’ bid for each contractor, but there is no single bid that suits

every contractor. Discuss this statement. (10%)

Переглянути це питання

In

preparing a pre-tender estimate for a 2-storey hospital clinic, you have access

to dimensioned sketch

design drawings and the floor plan of a typical unit in the residential

building as shown below.

(18%)

 

(a) 

Which method would you use in preparing

your pre-tender estimate? Justify your selection. (4%)

(b) 

For the method selected in (a), explain

the pricing process for floor finishes

of this two-storey clinic of similar layout plan by using

two

items (or

sub-elements) as examples [Note: you need to make reasonable assumptions in explaining the pricing process, and you are

not required to perform measurement tasks and access a cost guide] (10%)

(c)  

Discuss two

factors affecting

accuracy of your pre-tender estimate? (4%)

Переглянути це питання

In

preparing a pre-tender estimate for a 2-storey hospital clinic, you have access

to dimensioned sketch

design drawings and the floor plan of a typical unit in the residential

building as shown below.

(18%)

 

(a) 

Which method would you use in preparing

your pre-tender estimate? Justify your selection. (4%)

(b) 

For the method selected in (a), explain

the pricing process for floor finishes

of this two-storey clinic of similar layout plan by using

two

items (or

sub-elements) as examples [Note: you need to make reasonable assumptions in explaining the pricing process, and you are

not required to perform measurement tasks and access a cost guide] (10%)

(c)  

Discuss two

factors affecting

accuracy of your pre-tender estimate? (4%)

Переглянути це питання

Which of the following is not the key component of a mark-up in bid pricing?

0%
0%
0%
0%
Переглянути це питання

Which of the following would explain why contractors decided to bid for a project?

0%
0%
0%
0%
Переглянути це питання

Which of the following is not true of the findings in Oo et al.’s (2008) study on contractors’ bid or no-bid decision in Australia, Hong Kong, and Singapore?

Переглянути це питання

Хочете миттєвий доступ до всіх перевірених відповідей на moodle.telt.unsw.edu.au?

Отримайте необмежений доступ до відповідей на екзаменаційні питання - встановіть розширення Crowdly зараз!

Browser

Додати до Chrome