Let’s say the Mathebula Brick making construction Company generates 300 000 bricks with a value of R20 per brick using 4 workers at a cost of R90 000 for and increased output to R400 000 with a value of R22 per brick using similar number of workers @ R110 000 for
You are required to calculate the productivity factor and then state which of the following option is the correct answer for 2023?
The definition “the process whereby the job is carried out to minimise the imbalance between machines or workers while meeting a required output from the line” refers to which one of the following options?
The following information relates to ABC Caps:
Machine-controlled time
|
1.60 minutes
|
Outside work
|
0.80 of 90 rating
|
Unoccupied time
|
0.40 basic minutes
|
Contingency allowance
|
4%
|
Relaxation allowance
|
10% for representative basic minutes
|
Calculate the time for inside work and
state Which
ONEof the
following is the correct answer?
Match the terms/phrases in with the correct definitions/explanations in
Question number
|
SECTION A
|
SECTION B
|
2.1
|
Productivity
|
(A) The total time in which a job should be completed at standard performance, i.e. basic times plus contingency allowance plus relaxation allowance.
|
2.2
|
Machine productivity
|
(B) One of the factors that need to be considered when conducting an activity sampling study.
|
2.3
|
External productivity improvement techniques
|
(C) An extension of activity sampling that establishes the percentage of time during which activities occur by rating the number of units produced to calculate a basic time per unit.
|
2.4
|
Unrestricted work
|
D) a work measurement technique, being a development of estimating, in which the time required to carry out elements of a task at a defined rate of working is estimated partially from knowledge and practical experience of the work concerned and partially from synthetic data.
|
2.5
|
Load factor
|
(E) One of the input resources used to convert material into products.
|
2.6
|
Standard time
|
(F) That part of the total cycle time of a machine-controlled or process-controlled task that the worker is required to carry out at a standard performance level.
|
2.7
|
Representative sample
|
(G) Work in which the output of the worker is limited only by factors that the worker can control.
|
2.8
|
Rated activity sampling
|
(H) The attitude of workers and management towards productivity and economic and environmental factors.
|
2.9
|
Analytical estimating
|
(I) This can be measured in monetary terms, which is value earned over machine costs
|
2.10
|
Labour
|
(J) An efficiency criterion used to compare the output–input of an establishment, economy, organisation, industry or part of an industry to the same entity’s output–input during a previous period, to the output–input of other organisations/industries, or to set standards.
|
Inside work (IW) involves the task elements that can be conducted by a worker outside the machine-controlled or process-controlled times.
Which one of the following four options denotes how the productivity of materials is measured?
Which one of the follow options below denotes the attainment of a desired goal. In other words, the correct task has been completed regardless of the method or technique used.
Machine interference is defined as “the queuing of machines (or processes) for attention, for example when one worker is responsible for attending to more than one machine”.
Machine idle time is defined as “the time during which a machine is available for production or ancillary work, but owing to a shortage of work, materials or workers, it includes the time that the plant is out of balance”.
The aspects of labour control systems followed by management in an organisation follow a sequence. The correct sequence is: planning; measurement; comparison and evaluation; communication; and taking corrective action.