Which one of the follow options below denotes the attainment of a desired goal. In other words, the correct task has been completed regardless of the method or technique used.
Line balancing is conducted to maximise the balance between machines and workers while meeting the required line output.
When an activity sampling study is being done, the second step of activity sampling procedure is to determine the purpose of the study.
Work measurement plays a key role in improving operations in the workplace as it measures and sets observed times for productivity improvement in the organisation.
When rated activity sampling is performed, the observations must not be made at random, but at fixed intervals (e.g. one-minute intervals) and these intervals should be shorter than the shortest element duration.
To calculate standard time for unrestricted work, certain allowances should be added to the representative basic time. The allowances include relaxation and contingency allowances.
An organisation can improve its productivity by decreasing output and increasing input.
There are several aims of productivity measurement in the workplace, one of which is to serve as a psychological stimulus for to improve the performance of management, supervisors and workers.
Ensuring that workers know and understand what is expected of them by giving clear instructions and getting feedback is one of the factors that lead to efficient production.
Efficient production can be achieved if the individual is suited to the work. To ensure this, formulate clear job specifications and identify the aptitudes that candidates applying for the job should have is to provide training and practice to develop employers’ skills.