In MRP, if an item has a lead time of 2 weeks and is required in week 6, in which one of the following weeks should the order be placed?
Trend is a forecasting technique to project historical data to estimate future …
It is far simpler to change the capacity at a work centre, particularly over a short time frame. This can be done by …
Which concept does MRP use so that components become available for use in the manufacture of the parent, as the parent manufacturing order needs to be released?
Production activity control (PAC) translates the … and … into actionable instructions to facilitate the execution of those plans.
Which one of the following statements is the main objective of production activity control?
Which of the following would be considered waste in a lean production system?
What type of capacity is calculated by calculating it from the expected efficiency and utilisation of the work centres and other factors?
The MPS must be realistic and achievable with the existing (and planned) resources, in terms of both …