Looking for Project Lab (including SMSCP Level 1)_Elective A/B test answers and solutions? Browse our comprehensive collection of verified answers for Project Lab (including SMSCP Level 1)_Elective A/B at lms.bstsrhberlin.com.
Get instant access to accurate answers and detailed explanations for your course questions. Our community-driven platform helps students succeed!
Below picture is an example of CD(Counter DOWN) function :
ou encounter the following error after going online with the PLC,
indicated by blue and orange circles in
TIA Portal. During troubleshooting using manual you found theProgram on the computer does not
match with the program on PLC.
We have written a program in the Function Block called “Main Sequence” using the Graph programming language. The following picture shows this "Main Sequence" added in the Main Block (OB1). Where are these connections A, B, C, D, and E should be connected are also mentioned as :
A - 5, B - 3, C - 1, D - 4, E - 2
(1) “Cycles”.Auto (2) Start button (3) “Cycles”.Reset (4) “Cycles”.Manual (5) Stop
After compilation, I am facing the following error. What could be the cause?
You can monitor program blocks in real-time during PLC operation in TIA Portal.
Organizational Blocks (OBs) define the structure and cyclic behavior of the PLC program.
Function Chart (FCH) diagrams execute steps sequentially without conditions.
Function Chart (FCH) is a graphical programming language used in TIA Portal.
You are a PLC Engineer troubleshooting a control circuit issue. The problem: Motor M1 is not running. According to the current system status, the claw is confirmed to be closed, but motor M1 does not start.
Refer to the control diagram and the function chart below. Based on your observations and the available information, which of the following troubleshooting statements are correct?