Looking for MNO2611-25-S2 test answers and solutions? Browse our comprehensive collection of verified answers for MNO2611-25-S2 at mymodules.dtls.unisa.ac.za.

Get instant access to accurate answers and detailed explanations for your course questions. Our community-driven platform helps students succeed!

As the

head of the work study department at Mathebula Caps Manufacturing and

Embroidery Company, you have been requested by management to determine labour

performance as part of a work study investigation. The following information is

available:

Number of operators

5

Attendance time (per operator)

8 hours

Number of embroideries made using component

A

100

Standard time per piece using component A

10 std mins

Number of caps made using component B

20

Estimated standard time using component B

3 std mins

Total time spent on non-productive, uncontrolled work (group)

2 hours

Waiting and diverted time (department not responsible)

3 hours

Use the given

information to calculate operator performance of the Mathebula Caps Manufacturing

and Embroidery Company assembly line. Which

ONE

of

the following is the correct answer?

0%
0%
0%
100%
View this question

   

… can be

defined as “a work measurement technique in which the time for a task is

evaluated by comparing it with the work in a series of similar tasks

(benchmarks) whose work contents have been measured”.

View this question

Rated activity sampling

The output during the 0.1-minute interval was 10 items of caps for the Mathebula Caps Manufacturing and Embroidery Company. (See the number of items and the results of elements in Table 1 below.

Results

of the rated activity sampling study

Observation number

(0.1-min intervals)

Worker

Element 1

Element

2

Idle

1

85

 

 

2

 

90

 

3

95

 

 

4

 

95

 

5

90

 

 

6

 

 

100

7

95

 

 

8

95

 

 

9

 

95

 

10

 

 

100

Total

460

280

200

Use the information in the table above to calculate total basic time. Which ONE of the following is the correct answer?

0%
0%
0%
0%
View this question

Which ONE

of the following formulas is used to

calculate standard time?

0%
0%
0%
0%
View this question

Machine

idle time is defined as ____________

0%
0%
0%
0%
View this question

When

work activities in the plant or factory are done partly manually with the

support of machines or equipment, the activities are categorised as_____________ work.

0%
0%
0%
0%
View this question

XYZ

Company had specific productivity factors of 26 in 2024 and 25 in 2025.

Calculate the productivity index. Which

ONE

of

the following is the correct productivity index for XYZ Company?

View this question

Unoccupied

time is defined as _____________

View this question

During a

42-hour week, an embroidery machine was idle for 2 hours and broken for 2.5

hours. About 140 embroideries were produced. The standard time per embroidery

is 20 minutes. Calculate the machine utilisation index (MUI). Which

ONE of the following is the correct MUI?

View this question

The productivity

of organisations can be negatively affected in several ways.  Which

ONE

of the following will affect the productivity of an organisation negatively?

0%
0%
0%
0%
View this question